Getting things going Devin would handle most all the work on his own time. First on his list would be to fill 280 factory holes on the frame along with sectioning the rear of the frame and notching it for the rear axle clearance. Next the frame would be powder coated purple for the full frame off appeal.  
|
  The frame would then be accompanied by a T.C.I. 4-link to help the rear get down. With the adjustable suspension all installed along with the front spindles set in place, Devin would do a 3-inch body drop. Dual aluminum 3-gallon fuel cells would be installed to make room for the drop and interior needs while stainless brake lines where installed for the look and durability.
|