Getting the project on the way Mark would turn to Grunion Fabrications of Phoenix, AZ for their expertise in suspension modifications. While there a custom set of fender tubs would be welded into place along with the installation of chrome 2 link and panhard bar. Next the crew would install a set of chrome bag mounts, bridge and u-bolts along with chrome shocks at all 4 corners.
2
2
2
2
2
2
Bringing the front down with the rear a set of 2-inch drop spindles would be set in place. With the bag mounts in place and bags bolted up the crew would then install two chrome 5-gallon air tanks, 4 polished Viair 400 compressors, Aluminum valves and copper lines. A custom bracket holds everything under rear end of bed. Thanks to Cole Russell who helped install all these items and spent many late nights working hard on the installation.